五月激情丁香,亚洲国产精品国自产拍久久,波多野,精品一区二区三区

山東創(chuàng)圖建筑裝飾工程有限公司 山東創(chuàng)圖建筑裝飾工程有限公司
加工技術熱線:18660816658
  • 您當前位置: 首頁>>新聞動態(tài)>>行業(yè)動態(tài)富美家抗倍特掛墻需要注意的措施

    行業(yè)動態(tài)

    富美家抗倍特掛墻需要注意的措施

    來源:http://www.qq1980.cn/ 日期:2023-03-15 發(fā)布人:admin
    1、工藝流程測量放線、出實際測量圖→排版→板材加工→主龍骨安裝→副龍骨安裝→定位打孔、固定掛件→飾面板安裝→竣工清理;現場安裝龍骨和后臺板材生產可同時進行,能節(jié)省工期;
    1. Process flow measurement and setting out, drawing out actual measurement drawings → typesetting → plate processing → main keel installation → auxiliary keel installation → positioning and punching, fixing hanging parts → decoration panel installation → completion cleaning; On-site keel installation and back-office plate production can be carried out at the same time, which can save the construction period;
    2、測量放線、出實際測量圖進口板材為國外廠家定尺產品,而且受加工機具和精度的要求,只能在工廠加工成型,現場不具備加工條件。受磚縫影響,現場安裝調整量在2mm以內,因此要求嚴格測量出建筑物的實際尺寸。除測量建筑物的幾個大角外,所有門窗尺寸、位置都應予以實測,套方找正,并根據測量結果繪制實際測量圖,并以此作為排版的前提。如果有必要,窗洞口位置還須根據排版要求作微量調整。還要考慮與其他區(qū)域不同材料交圈的具體情況,實際測量結果給后續(xù)工作帶來很大便利;
    2. The imported plates for measuring and setting out and drawing the actual measuring drawings are the fixed-length products of foreign manufacturers, and can only be processed and formed in the factory due to the requirements of processing machines and tools and accuracy, and there are no processing conditions on the site. Due to the influence of brick joints, the on-site installation adjustment is within 2mm, so it is required to strictly measure the actual size of the building. In addition to measuring several large corners of the building, the size and position of all doors and windows should be measured, square and aligned, and the actual measurement map should be drawn according to the measurement results, which is the premise of typesetting. If necessary, the window opening position must also be slightly adjusted according to the typesetting requirements. It is also necessary to consider the specific situation of the circle crossing with different materials in other regions, and the actual measurement results will bring great convenience to the follow-up work;
    3、排版受磚縫和板材定尺的影響,使用計算機和CAD軟件進行排版,經過反復優(yōu)化,考慮板材大利用率,在取得終排版方案后,針對每一塊板材細化加工圖及相應的開槽圖及板材四周的企口加工圖,一一編號,作為加工依據;
    富美家潔菌樹脂板
    3. The layout is affected by the brick seam and the plate sizing. The computer and CAD software are used for layout. After repeated optimization, the maximum utilization rate of the plate is considered. After the final layout plan is obtained, the detailed processing drawing and the corresponding slotting drawing of each plate and the groove processing drawing around the plate are numbered one by one as the processing basis;
    4、板材加工根據加工圖,所有板材均要求使用數控平板切割刨槽機進行加工,精度誤差要求在0?5mm以內,以確保安裝精度;
    4. According to the processing drawing, all plates are required to be processed with CNC flat plate cutting and grooving machine, and the accuracy error is required to be within 0? Within 5mm to ensure installation accuracy;
    5、龍骨制作安裝所有龍骨均進行熱鍍鋅處理,焊縫涂刷防腐漆,焊接材料必須符合國家標準。龍骨安裝后,必須進行反復檢查校正,對于橫龍骨可采用經緯儀作通長檢查。
    5. Keel fabrication and installation All keels shall be hot-dip galvanized, and the weld shall be painted with anti-corrosion paint. The welding materials must meet the national standards. After the keel is installed, it must be checked and corrected repeatedly. For the horizontal keel, the theodolite can be used for the overall length inspection.
    6、定位打孔、固定掛件板材加工完成后,按加工圖一一核實,檢查無誤后按設計位置對板材背部的掛件進行定位,并按要求打孔,安裝掛件,要求定位誤差控制在±0?5mm,并逐一檢查牢固性。打孔必須對電鉆加限位裝置,防止鉆深。
    6. After the processing of the plates for positioning, punching and fixing the hanging parts is completed, verify them one by one according to the processing drawing, and then position the hanging parts on the back of the plates according to the design position, punch holes as required, and install the hanging parts. The positioning error is required to be controlled within ± 0? 5mm, and check the firmness one by one. The electric drill must be equipped with a limit device to prevent drilling depth.
    7、板材安裝安裝順序原則上是自下而上、自邊而內安裝,后窗臺收口。安裝時注意及時將插片插入豎向槽內,同時注意企口朝向是否正確。每安裝鋪設1排墻板后,應檢查一次垂直度和平整度,調整板縫寬度,以便及時消除安裝誤差;飾面板安裝完畢后,也可用硅酮膠、收口條處理企口4mm黑縫隙(看設計風格而定,一般也不用處理),要注意在易于被污染的部位用塑料薄膜覆蓋保護。
    7. In principle, the installation sequence of plates is from bottom to top, from side to inside, and finally the window sill is closed. During installation, pay attention to inserting the insert into the vertical slot in time, and pay attention to whether the groove orientation is correct. After each row of wallboard is installed and laid, the verticality and flatness shall be checked once, and the width of the board joint shall be adjusted to eliminate the installation error in time; After the installation of the decorative panel, the 4mm black gap of the rabbet can also be treated with silicone rubber and closing strip (depending on the design style, it is generally not necessary to treat it). Pay attention to cover and protect the parts prone to pollution with plastic film.
    8、竣工清理在全部工序完成后進行檢查驗收,驗收合格后然后統一撕去板材的保護膜,對于板材的局部污染,可采用中性清洗劑進行清理。
    8. The completion cleaning shall be inspected and accepted after the completion of all processes. After the acceptance, the protective film of the plate shall be uniformly removed. For the local pollution of the plate, neutral cleaning agent can be used for cleaning.
    聯系我們

    產品銷售熱線:18660816658

    技術方案咨詢:18560211715

    倉庫地址:山東省濟南市天橋區(qū)金鑫產業(yè)園303倉庫

    九江工廠:九江市江東大道3號

    臺灣新竹工廠:臺灣新竹

    泰國曼谷工廠:泰國曼谷

    關注我們
    山東創(chuàng)圖建筑裝飾工程有限公司 備案號:魯ICP備14019259號-2 網站地圖 XML TXT 魯公網安備37010502002020號

    截屏,微信識別二維碼

    微信號:18660816658